- Custom: Finish, Media, Branding, Packaging
- In-House Product Lines Across 5 Factories
- Lead Time: ~180 Days (Complexity-Based)
Filtered Showerhead OEM/ODM Manufacturer
Custom finishes, media, branding, and packaging. Fast with existing models, or just ~180 days for new development.
Two Ways to Build Your Filtered Showerhead Line
A. Customize From Existing Models
Choose a showerhead platform from our catalogue or from our product categories, then tailor your key brand elements: appearance, filter configuration approach, branding, and packaging, and more. This path is ideal for e-commerce and shower brands that want a reliable, lower-risk launch using proven structures.
B. Develop a New Product
If you need a unique look, structure, or product concept, we can run an ODM project with engineering-led development. We’ll guide feasibility, prototyping, tooling, and the production ramp-up. Typical lead time is around 180 days, depending on complexity and validation requirements.
Dedicated Production Lines for Filter Cartridges
VERTICAL INTEGRATION
To ensure stable supply and consistent performance, we operate dedicated production lines for filter cartridges, built specifically for cartridge assembly and output control. This helps brands maintain repeatable quality across batches and supports long-term programs for refills and repeat orders.
Filtered Showerhead You Can Customize
Start from our proven structures to reduce risk, lead time, and development cost, then customize what matters for your brand.
Wall-Mount Filtered Showerheads
Handheld Filtered Showerheads
Replaceable Cartridges
What You Can Customize
Branding
Add your logo and printing details across product parts.
Packaging Styles
Pick retail, eco, or bulk packaging for your sales channel.
Surface Finishes
Choose finishes and colors to match your product’s look.
Filter media
Select the filter media setup for your target needs.
Ready to customize?
Send your target market + expected order volume and we’ll propose the best-fit platforms.
Build a New Product With Full Engineering Support
When your goal is a unique structure, an exclusive look, or a product concept that can’t be achieved through platform customization, ODM development is the right path. We help translate your idea into a manufacturable design, manage the iteration process, and guide the project through tooling and mass production. Below is our development process from concept to production.
Plastic Parts Duration: 40-45 days
Metal Parts Duration: 60-65 days
Final production lead times begin after T1 approval and packaging confirmation. These timeframes include material procurement, molding, surface finishes, assembly (if applicable), and final packaging.
Duration: 2 weeks
Our team creates detailed 3D models and mechanical drawings to validate structure, function, and feasibility before prototyping. Includes DFM (Design for Manufacturing) input.
3D Modeling & Engineering Design
Functional Prototype
Mass Production
Mold Fabrication
Injection Molding
Trial 1 (T1) – Sample Run
Duration: 45–60 days
Production tooling is built once the prototype is approved. Each mold is engineered for long-term use and can produce up to 500,000 pieces. Tooling is optimized for durability and part accuracy.
Duration: 7–10 working days (after final design)
We create a working prototype to test function, appearance, and assembly fit. This step helps reduce revisions during mold development.
3D Modeling & Engineering Design
Duration: 2 weeks
Our team creates detailed 3D models and mechanical drawings to validate structure, function, and feasibility before prototyping. Includes DFM (Design for Manufacturing) input.
Functional Prototype
Duration: 7–10 working days (after final design)
We create a working prototype to test function, appearance, and assembly fit. This step helps reduce revisions during mold development.
Mold Fabrication
Duration: 45–60 days
Production tooling is built once the prototype is approved. Each mold is engineered for long-term use and can produce up to 500,000 pieces. Tooling is optimized for durability and part accuracy.
Injection Molding
Duration: Varies by complexity and quantity
Once the mold is complete, we move into injection molding. We adjust machine scheduling and cycle times based on material, part size, and finish requirements.
Trial 1 (T1) – Sample Run
Duration: 7–10 days
We conduct a small production run of approximately 100 pcs to test mold performance and part consistency. Once T1 is approved, packaging specifications are confirmed and locked in.
Mass Production
Plastic Parts Duration: 40-45 days
Metal Parts Duration: 60-65 days
Final production lead times begin after T1 approval and packaging confirmation. These timeframes include material procurement, molding, surface finishes, assembly (if applicable), and final packaging.
Duration: Varies by complexity and quantity
Once the mold is complete, we move into injection molding. We adjust machine scheduling and cycle times based on material, part size, and finish requirements.
Duration: 7–10 days
We conduct a small production run of approximately 100 pcs to test mold performance and part consistency. Once T1 is approved, packaging specifications are confirmed and locked in.
Why Choose Us
Multi-Cultural Collaboration Platform
Our Hong Kong headquarters connects us with a diverse network of international partners and clients in the UK, USA, China, Japan, Germany, Italy, Indonesia, and more
Robust Global Manufacturing Network
We manage production in-house with 5 factories and over 50 partners in China, delivering quality, speed, and innovation to global customers.
End-to-End Professional Excellence
From concept to market launch, our cross-functional teams bring your vision to life with proven track record in delivering high-quality sanitary products for global brands.
Innovation-Driven R&D Support
We invest in the future of bathroom innovation with strong in-house R&D capabilities, supporting product development. Through strategic funding and technical resources, we help turn new ideas into products.
Dedicated Customer Support
Our dedicated customer support team is here to guide you every step of the way, from initial inquiry to post-delivery follow-up. We’re quick to respond and focused on helping your project succeed.
30+ Years of Industry Experience
With over 30 years of experience, we've completed 6,000+ projects and supported 700+ global customers. Trusted by leading sanitary brands.
Let’s Build Your Next Product Together
Tell us what you’re building. We’ll respond with platform recommendations (or ODM feasibility), customization options, and an estimated timeline.
Filter Showerheads Display
Explore our range of fully assembled filter showerheads, designed for performance, comfort, and style. These finished products highlight our OEM capabilities in combining advanced filtration media with sleek, market-ready designs.
FAQs
We know you might have a few questions, so we’ve put together some helpful answers to get you started. If you don’t find what you’re looking for, we’re always here to help!
-
Yes. Many brands begin with a customized platform to validate demand, then move to ODM for deeper differentiation once the market is proven.
-
Typical lead time is around 180 days, depending on complexity, tooling, and validation requirements. Platform customization is usually faster than full ODM.
-
Target market, product type, customization level, estimated volume, and any reference links or concept images are the most helpful.
-
Yes. We can support box/inserts/manual direction and bundle configuration so your product is ready for listings and fulfillment workflows.
-
Our procedures are aligned with ISO 9001 principles, and we can adapt to specific customer standards if required.