• Custom: Finish, Media, Branding, Packaging
  • In-House Product Lines Across 5 Factories
  • Lead Time: ~180 Days (Complexity-Based)

Filtered Showerhead OEM/ODM Manufacturer

Custom finishes, media, branding, and packaging. Fast with existing models, or just ~180 days for new development.

Two Ways to Build Your Filtered Showerhead Line

A. Customize From Existing Models

Choose a showerhead platform from our catalogue or from our product categories, then tailor your key brand elements: appearance, filter configuration approach, branding, and packaging, and more. This path is ideal for e-commerce and shower brands that want a reliable, lower-risk launch using proven structures.

B. Develop a New Product

If you need a unique look, structure, or product concept, we can run an ODM project with engineering-led development. We’ll guide feasibility, prototyping, tooling, and the production ramp-up. Typical lead time is around 180 days, depending on complexity and validation requirements.

Dedicated Production Lines for Filter Cartridges

VERTICAL INTEGRATION

To ensure stable supply and consistent performance, we operate dedicated production lines for filter cartridges, built specifically for cartridge assembly and output control. This helps brands maintain repeatable quality across batches and supports long-term programs for refills and repeat orders.

Filtered Showerhead You Can Customize

Start from our proven structures to reduce risk, lead time, and development cost, then customize what matters for your brand.

Wall-Mount Filtered Showerheads

Handheld Filtered Showerheads

Replaceable Cartridges

What You Can Customize

Branding

Add your logo and printing details across product parts.

Packaging Styles

Pick retail, eco, or bulk packaging for your sales channel.

Surface Finishes

Choose finishes and colors to match your product’s look.

Filter media

Select the filter media setup for your target needs.

Ready to customize?

Send your target market + expected order volume and we’ll propose the best-fit platforms.

Build a New Product With Full Engineering Support

When your goal is a unique structure, an exclusive look, or a product concept that can’t be achieved through platform customization, ODM development is the right path. We help translate your idea into a manufacturable design, manage the iteration process, and guide the project through tooling and mass production. Below is our development process from concept to production.

Plastic Parts Duration: 40-45 days

Metal Parts Duration: 60-65 days
Final production lead times begin after T1 approval and packaging confirmation. These timeframes include material procurement, molding, surface finishes, assembly (if applicable), and final packaging.

Duration: 2 weeks
Our team creates detailed 3D models and mechanical drawings to validate structure, function, and feasibility before prototyping. Includes DFM (Design for Manufacturing) input.

3D Modeling & Engineering Design

Functional Prototype

Mass Production

Hands sketching wireframes of a mobile app interface with sketches of video, image, and text sections, surrounded by colored pencils and additional paper sketches with icons and text.
Stacked boxes or containers on a conveyor belt with an app icon above.
Industrial manufacturing machinery with yellow safety enclosure, wires, and control panels in a factory setting.
Bottles of ice tea on a conveyor belt in a manufacturing plant.
3D logo with arrows forming a circle around the text '3D'.
Icon of a factory with smoke coming out of chimneys
A stylized icon of a screwdriver showing a flat-head tip.
A microscope and a glass with a beverage or liquid.
An illustration of a laboratory beaker, a checklist on paper, and a test tube, representing scientific research and experiments.
3D logo with circular arrows around the text.

Mold Fabrication

Injection Molding

Person working on computer designing a 3D model of a showerhead.
Close-up of a 3D printer extruder printing with orange filament, with orange printed parts underneath on a textured black surface, illuminated with colorful lighting.
Person holding three different countertop samples: gray marble, wood grain tile, and black marble with white veining, in front of a laptop displaying design plans.

Trial 1 (T1) – Sample Run

Duration: 45–60 days
Production tooling is built once the prototype is approved. Each mold is engineered for long-term use and can produce up to 500,000 pieces. Tooling is optimized for durability and part accuracy.

Duration: 7–10 working days (after final design)
We create a working prototype to test function, appearance, and assembly fit. This step helps reduce revisions during mold development.

3D Modeling & Engineering Design

Duration: 2 weeks
Our team creates detailed 3D models and mechanical drawings to validate structure, function, and feasibility before prototyping. Includes DFM (Design for Manufacturing) input.

Functional Prototype

Duration: 7–10 working days (after final design)
We create a working prototype to test function, appearance, and assembly fit. This step helps reduce revisions during mold development.

Mold Fabrication

Duration: 45–60 days
Production tooling is built once the prototype is approved. Each mold is engineered for long-term use and can produce up to 500,000 pieces. Tooling is optimized for durability and part accuracy.

Injection Molding

Duration: Varies by complexity and quantity
Once the mold is complete, we move into injection molding. We adjust machine scheduling and cycle times based on material, part size, and finish requirements.

Trial 1 (T1) – Sample Run

Duration: 7–10 days
We conduct a small production run of approximately 100 pcs to test mold performance and part consistency. Once T1 is approved, packaging specifications are confirmed and locked in.

Laboratory flask, checklist, and test tube symbolizing scientific research or experiments.

Mass Production

Plastic Parts Duration: 40-45 days

Metal Parts Duration: 60-65 days

Final production lead times begin after T1 approval and packaging confirmation. These timeframes include material procurement, molding, surface finishes, assembly (if applicable), and final packaging.

Duration: Varies by complexity and quantity
Once the mold is complete, we move into injection molding. We adjust machine scheduling and cycle times based on material, part size, and finish requirements.

Duration: 7–10 days
We conduct a small production run of approximately 100 pcs to test mold performance and part consistency. Once T1 is approved, packaging specifications are confirmed and locked in.

Industrial factory with smoke stacks emitting smoke.
A stylized illustration of a bottle pouring liquid into a container.
A pixelated teal plus sign or cross symbol on a white background.
A stack of teal boxes on a conveyor belt with a teal app icon above the stack, resembling a warehouse or packaging process.

Why Choose Us

Multi-Cultural Collaboration Platform

Our Hong Kong headquarters connects us with a diverse network of international partners and clients in the UK, USA, China, Japan, Germany, Italy, Indonesia, and more

Robust Global Manufacturing Network

We manage production in-house with 5 factories and over 50 partners in China, delivering quality, speed, and innovation to global customers.

End-to-End Professional Excellence

From concept to market launch, our cross-functional teams bring your vision to life with proven track record in delivering high-quality sanitary products for global brands.

Innovation-Driven R&D Support

We invest in the future of bathroom innovation with strong in-house R&D capabilities, supporting product development. Through strategic funding and technical resources, we help turn new ideas into products.

Dedicated Customer Support

Our dedicated customer support team is here to guide you every step of the way, from initial inquiry to post-delivery follow-up. We’re quick to respond and focused on helping your project succeed.

30+ Years of Industry Experience

With over 30 years of experience, we've completed 6,000+ projects and supported 700+ global customers. Trusted by leading sanitary brands.

Let’s Build Your Next Product Together

Tell us what you’re building. We’ll respond with platform recommendations (or ODM feasibility), customization options, and an estimated timeline.

Filter Showerheads Display

Explore our range of fully assembled filter showerheads, designed for performance, comfort, and style. These finished products highlight our OEM capabilities in combining advanced filtration media with sleek, market-ready designs.

FAQs

We know you might have a few questions, so we’ve put together some helpful answers to get you started. If you don’t find what you’re looking for, we’re always here to help!

  • Yes. Many brands begin with a customized platform to validate demand, then move to ODM for deeper differentiation once the market is proven.

  • Typical lead time is around 180 days, depending on complexity, tooling, and validation requirements. Platform customization is usually faster than full ODM.

  • Target market, product type, customization level, estimated volume, and any reference links or concept images are the most helpful.

  • Yes. We can support box/inserts/manual direction and bundle configuration so your product is ready for listings and fulfillment workflows.

  • Our procedures are aligned with ISO 9001 principles, and we can adapt to specific customer standards if required.